Essential ImprovementsBedok North St 3 PrecinctIf you vote “Yes” for the Home Improvement Programme, the Government will fully pay for the following Essential Improvements even if you do not choose any of the Optional Improvements: Repair of spalling concrete/structural cracksReplacement of waste/soil discharge stacks1Replacement of pipe sockets with new clothes drying racksUpgrading of electrical loadOptional ImprovementsYou can choose any of the following items within your flat: Upgrading of existing toilet(s)/bathroom(s) package2New decorative door3New metal grille gateNew refuse chute hopperEnhancement for Active Seniors (EASE)You can choose any of the following items based on your needs: Installation of ramps4Application of slip-resistant treatment to floor tiles of one toilet/bathroom [Treated tiles may require more cleaning]Installation of grab bars5Notes: 1.If flat owners have installed fittings, fixtures or cabinets which obstruct the replacement of the waste/soil discharge stack, flat owners are required to remove and reinstate them at their own costs to facilitate the replacement works.2. Package includes waterproofing of floors, tiling of floors and walls, addition of grab bar and provision of new squat/pedestal pan, wash basin, doors and vents.If you decide that you do not want some of the toilet upgrading works, eg. installation of grab bar, no discount will be given. The materials will also not be given to you.3. Applicable to flats that do not require fire-rated doors.4. Ramp to the main entrance is for entrance with one-step only and will be offered if technically feasible, eg no space constraints or compliance to authorities’ requirements. Ramps to negotiate level differences within the flat will be offered if required and technically feasible. You can choose up to five ramps and pay accordingly. 5. Locations/ positions of grab bars and ramps shall be recommended to you at a later stage; during the condition survey of your flat. Improvements for EASE are offered on supply and install basis. Materials will not be provided if you choose not to have them installed.
请问HIP的内容是随着不同block 而不同还是全国都一样?Repair of spalling concrete/structural cracks 这个指的是外墙还是屋内?Replacement of waste/soil discharge stacks 这个是说厕所排水管?Upgrading of electrical load 这个是指什么?New decorative door3 这是指哪里的门?
谢谢顶帖加分,表示不知道,楼下请回答:)请问HIP的内容是随着不同block 而不同还是全国都一样?根据所在的户型有所小的不同,但大体都一样。Repair of spalling concrete/structural cracks 这个指的是外墙还是屋内?主要指屋内的厅,厨房,厕所墙Replacement of waste/soil discharge stacks 这个是说厕所排水管?指厨房,厕所的排水管和污水管!Upgrading of electrical load 这个是指什么?厅,厨房,厕所的电线New decorative door3 这是指哪里的门?大门和厕所的门!
分类